    • Karur Transmission Limited
      Evacuation of power from RE sources in Karur / Tiruppur Wind Energy Zone (Tamil Nadu) (2500 MW)

    • Koppal-Narendra Transmission Limited
      Evacuation of power from RE sources in Koppal Wind Energy Zone (Karnataka) (2500MW)

    • Ananthpuram Kurnool Transmission Limited
      Transmission scheme for Solar Energy Zone in Ananthpuram (Ananthapur) (2500 MW) and Kurnool (1000 MW), Andhra Pradesh

    • Bhadla-Sikar Transmission Limited
      Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1 GW) under Phase-II Part-E

    • Khetri-Narela Transmission Limited
      Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1 GW) under Phase-II Part-G

    • Kishtwar Transmission Limited
      Transmission system for evacuation of power from Pakaldul HEP in Chenab Valley HEPs -Connectivity System

    • Khavda-Bhuj Transmission Limited
      Transmission scheme for evacuation of 3 GW RE injection at Khavda P.S. under Phase-I

    • Nangalbibra-Bongaigaon Transmission Limited
      Establishment of new 220/132kV substation at Nangalbibra

    • Bijawar-Vidarbha Transmission Ltd
      Connectivity System for LancoVidarbha Thermal Power Pvt. Ltd. (LVTPPL) & Inter State Transmission system strengthening in Chhatarpur area in Madhya Pradesh

    • ShongtongKarcham-wangtoo Transmission Ltd
      Connectivity and Long Term Access (LTA) to HPPCL 450 MW from ShongtongKarcham HEP

    • Tanda Transmission Company Ltd
      ATS for Tanda Expansion TPS (2x660 MW)

    • Mohanlalganj Transmission Ltd.
      Construction of 400/200/132 KV GIS Substation, Mohanlalganj (Lucknow) with associated 400 KV Lines , and other 765 KV & 400 KV Lilo Lines at 765 KV GIS Substation Rampur and 400 KV Lilo (Quad MCOSE on Monopole) at 400 KV GIS Substation Sector 123 Noida.

    • Transmission system for evacuation of power from Chhatarpur SEZ (1500 MW)